Hotel rooms remodeling

Diseño Arquitectónico Contratista de obra Remodelación
Hotel rooms remodeling

Services provided

  • Construction: demolition of bars and floors

  • Design: 3D proposal to define materials

  • Finishes: application of texture paste and painting

  • Installation of anti-noise aluminum windows

  • Installation: fan-coil air conditioning

  • Manufacture: onyx lamps

  • Manufacturing: granite bars imported from Brazil

  • Manufacturing: modification of existing carpentry’s design and varnishing

Request a quote

Photo gallery

We made a total remodeling of 27 rooms at Hotel Torre Vallarta. The project lasted 3 months and was developed through 3 storeys.