Hotel rooms remodeling
Diseño Arquitectónico Contratista de obra RemodelaciónServices provided
Construction: demolition of bars and floors
Design: 3D proposal to define materials
Finishes: application of texture paste and painting
Installation of anti-noise aluminum windows
Installation: fan-coil air conditioning
Manufacture: onyx lamps
Manufacturing: granite bars imported from Brazil
Manufacturing: modification of existing carpentry’s design and varnishing
Photo gallery
We made a total remodeling of 27 rooms at Hotel Torre Vallarta. The project lasted 3 months and was developed through 3 storeys.